Attach a processing event
- Open the Processing tab or paste the incoming batch code into the search.
- Choose "Add processing event".
- Enter processing location, energy consumed (kWh), and added CO₂.
- Save. The event is hash-chained to the previous extraction event.
Multiple stages
You can attach more than one processing event to the same batch (e.g. crushing, then refining). Each is time-stamped and signed by your account.
